Tætningsplade VB JGS rulle
Fuldt belagt på begge sider

artikelnummer 070476

Samling af metalplader VB JGS

Test af vandtryk Modstandsdygtighed over for gylle/flydende gødning/silageudløb

Byggemyndighedsgodkendt, fuldt belagt metalvandstop på begge sider
. inkl. 30 omega-beslag
og og 2 stødklemmer

Tilføj til meddelelsesliste

De vigtigste oplysninger på et øjeblik

artikelnummer:
070476
Artikelgruppe:
220 - Dichtblech VB JGS
GTIN:
4251689504624
toldtariffens nummer:
73269098
Pakkeenhed:
Rulle
salgsmængde enhed:
20 m
materiale:

St 37, galvaniseret
. Meget modstandsdygtig belægning med speciel primer, stofforstærket

farve:
sort
Godkendelse:

AbZ/ABG: Z-74.101-209

.
Længde på fugeplade:

20,00 m

.
Højde på fugeplade:

160 mm

.
Fælles pladetykkelse:

ca. 0,6 mm

Tykkelse af den særlige belægning:

ca. 0,15 mm

Samlet styrke:

ca. 0,9 mm

Emballage:

Rulle:
Karton (40 x 40 x 20 cm)
. 1 stk. rulle
. 2 stk stumpklemmer
. 30 fastgørelsesbeslag
36 kasser pr. palle

termisk anvendelsesområde:
- 20°C til 90°C
opbevaring:
Opbevares i ubeskadiget og uåbnet originalemballage på et tørt sted væk fra direkte sollys.
bortskaffelse:
Kan bortskaffes på husholdningsaffaldssteder i overensstemmelse med lokale regler for bortskaffelse af affald

Remove the bottom half of the parted protective foil from the special coating.


Place the VB JGS joint sheet metal in the centre of the rising wall on top of the upper reinforcement layer.
Push the mounting brackets with a maximum distance of 70 cm over the sheet metal and fix them to the upper reinforcement layer with binding wire.
The embedment depth in the concrete must be at least 35 mm and must not be more than half the height of the sheet metal.


The VB JGS joint sheet metal  must overlap by at least 6 cm in the area of the joint, in the straight sections and also in the corner area.


To do so, the upper protective foil must be turned back in the area subsequently to be joined.


Overlap the VB JGS joint sheet metal by at least 6 cm and press the two ends firmly together.
The joint must be glued over its full height and entire surface to prevent subsequent water permeation.
There must be no contamination on the adhesive surfaces that could interfere with bonding.


Secure the joint with one of the fixing clips provided and fold the protective foil back onto the special coating.


Prepared joints in the straight sections as well as the corner area.

Once the foundation slab has been concreted, and before the wall formwork is closed, the remaining protective foil must be removed.
The concreting of the wall base and corresponding preparations must be carried out in accordance with the established technical standards.


Special requirements for installation and documentation:

- Processing certificate: The processor confirms to have been informed or instructed regarding the processing instructions, restrictions and changes.

- Acceptance certificate: The processing company and an expert confirm that the VB JGS joint sheet metal has been installed in accordance with the regulations.

- Documentation: There is a documentation obligation regarding the batch number of the installed sealing sheets. This can be taken from the label or the delivery bill.

Status: 23.03.2022


installation in precast-wall

Download DWG

Download PDF

installation in in-situ concrete

Download DWG

Download PDF

corner and overlap situation

Download DWG

Download PDF

Kontakt os

Vi svarer gerne på dine spørgsmål

Indtast venligst navn
Indtast venligst firma
Indtast venligst by
Indtast venligst e-mail
Indtast venligst emne
Indtast venligst besked

Udfyld venligst følgende captcha for at reducere spam.

Indtast venligst captcha.

Vi må ikke kontakte dig, hvis du ikke er enig i vores erklæring om databeskyttelse.