Foglio di tenuta 160 VB 2 strisce á 2,40 m-o.O.
Completamente rivestito su entrambi i lati

numero di articolo 070430

Foglio di giunzione VB in strisce

test di durata CE Test della pressione dell'acqua

Completamente rivestito su entrambi i lati
Foglio di tenuta, larghezza 160 mm
Lunghezza dell'elemento 2,4 m
Confezione 50 elementi
incl. 55 morsetti di sicurezza

Certificato di collaudo dell'ispettorato edilizio MFPA di Lipsia
Neutro per le acque sotterranee

Aggiungi all'elenco degli avvisi

Le informazioni più importanti in un colpo d'occhio

switch_to_language DE
switch_to_language GB
switch_to_language FR
switch_to_language NL
switch_to_language IT
switch_to_language ES
switch_to_language CZ
switch_to_language PL
switch_to_language RO
switch_to_language DK
switch_to_language SE
switch_to_language NO
switch_to_language FI
switch_to_language RS
switch_to_language RU
switch_to_language GR
switch_to_language TR

Vai a Youtube

numero di articolo:
070430
gruppo di articoli:
200 - Dichtblech VB Streifen h=160 mm
GTIN:
4251689511004
numero di tariffa doganale:
73269098
unità di imballaggio:
cassa
quantità di vendita unità:
120 m
materiale:

St 37, zincato
Rivestimento speciale: plastica polimerica rinforzata con tessuto

colore:
nero
Lunghezza della piastra di tenuta:

2,4 m

Piastra di tenuta Höche:

160 mm

Spessore della lastra:

Circa 0,6 mm

Spessore del rivestimento speciale:

Circa 0,15 mm

Spessore totale del foglio di tenuta:

Circa 0,9 mm

Certificato di prova / autorizzazione:

Certificato di collaudo dell'autorità edilizia generale (AbP)
MFPA Lipsia

Zone di ricambio dell'acqua adatte:

Ja

Corrisponde a:

Utilizzare la classe A per le classi di carico 1 e 2 secondo le linee guida WU

.
Contiene sostanze dell'elenco SVHC o in peso proporzionale ≥0,1%.:

No

Il prodotto è conforme alla normativa REACH:

Ja

Imballaggio:

Cassetta in legno (255 x 30 x 25 cm)
50 pezzi di strisce
55 pezzi morsetti di testa
12 scatole per pallet

Intemperie UV:

Le lastre già installate nella prima sezione di calcestruzzo possono essere esposte agli agenti atmosferici UV liberi per un massimo di 4 settimane fino alla completa installazione nel calcestruzzo. Se i lavori di costruzione vengono interrotti per un periodo più lungo, le lastre devono essere appositamente protette dai raggi UV (pellicole scure, ecc...) per non comprometterne l'utilizzabilità.

campo di applicazione termico:
- Da 20°C a 90°C
tenuta alla pressione dell'acqua:
fino a max. 2 bar (20 m di colonna d'acqua)
Test di applicazione tecnica fino a 8 bar
immagazzinamento:
Conservare la confezione originale non danneggiata e non aperta in un luogo asciutto e al riparo dalla luce solare diretta.
smaltimento:
Può essere smaltito presso le discariche domestiche in conformità con le normative locali sullo smaltimento dei rifiuti.

Remove the bottom half of the parted protective foil from the special coating.


Place the VB joint sheet metal in the centre of the rising wall on top of the upper reinforcement layer.
Push the mounting brackets with a maximum distance of 70 cm over the sheet metal and fix them to the upper reinforcement layer with binding wire.
The embedment depth in the concrete must be at least 3 cm and must not be more than half the height of the sheet metal.


The VB joint sheet metal  must overlap by at least 6 cm in the area of the joint, in the straight sections and also in the corner area.


To do so, the upper protective foil must be turned back in the area subsequently to be joined.


Overlap the VB joint sheet metal by at least 6 cm and press the two ends firmly together.
The joint must be glued over its full height and entire surface to prevent subsequent water permeation.
There must be no contamination on the adhesive surfaces that could interfere with bonding.


Secure the joint with one of the fixing clips provided and fold the protective foil back onto the special coating.


Prepared joints in the straight sections as well as the corner area.

Once the foundation slab has been concreted, and before the wall formwork is closed or the double wall elements have been set up, the remaining protective foil must be removed.
The concreting of the wall base and corresponding preparations must be carried out in accordance with the established technical standards.

Status: 23.03.2022


joint sheet metal in precast wall

Scarica il DWG

Scaricare PDF

joint sheet metal in in-situ concrete

Scarica il DWG

Scaricare PDF

Accessori

accessori adatti

Set di collegamento con nastro di tenuta per giunti

Il raccordo del nastro di tenuta è un modo semplice, rapido e sicuro per collegare il foglio di tenuta VB o il foglio di tenuta MA...

Test della pressione dell'acqua
Piastra di tenuta VB angolo 90°

Elemento angolare prefabbricato a 90° ...

Morsetto di sicurezza h=170 mm

Per il fissaggio dei giunti di sovrapposizione dei waterstop in metallo rivestito ...

Omegabar 160 mm

Supporto di fissaggio per i fermi di metallo fino a un'altezza di 160 mm ...

Prodotti simili

Potete trovare prodotti simili qui.

Piastra di tenuta MASTER

Il foglio di tenuta con guida di contenimento per la sigillatura dei giunti di costruzione Quando si sigillano i giunti di costr...

Test della pressione dell'acqua
Foglio di tenuta 160 VB2 in rotolo

L'impermeabilizzazione dei giunti di costruzione in calcestruzzo pone elevati requisiti alla tecnologia di impermeabilizzazio...

test di durata CE Test della pressione dell'acqua

Contattateci

Siamo lieti di rispondere alle vostre domande

Inserire il nome
inserire l'azienda
inserire la città
Inserire l'e-mail
Inserire l'oggetto
Inserire il messaggio

Si prega di compilare il seguente captcha per ridurre lo spam.

Inserire il captcha.

Non siamo autorizzati a contattarvi se non siete d'accordo con la nostra dichiarazione sulla privacy dei dati.