Tôle d'étanchéité 160 VB 2 bandes à 2,00 m-surface
entièrement revêtu sur les deux faces

numéro d'article 070432

Bandes de tôle d’étanchéité VB

test de la stabilie CE Test de résistance à l'eau sous pression

Revêtement intégral sur les deux faces
. tôle d'étanchéité, largeur 160 mm
longueur de l'élément 2,0 m
emballage 50 éléments
y compris 55 agrafes de jonction

.

Certificat de contrôle de la construction MFPA Leipzig
. Neutre pour les eaux souterraines

Ajouter à la notice

Aperçu des informations les plus importantes

switch_to_language DE
switch_to_language GB
switch_to_language FR
switch_to_language NL
switch_to_language IT
switch_to_language ES
switch_to_language CZ
switch_to_language PL
switch_to_language RO
switch_to_language DK
switch_to_language SE
switch_to_language NO
switch_to_language FI
switch_to_language RS
switch_to_language RU
switch_to_language GR
switch_to_language TR

Youtube

numéro d'article:
070432
groupe d'articles:
200 - Dichtblech VB Streifen h=160 mm
GTIN:
4251689511011
numéro tarifaire:
73269098
Conditionnement :
caisse
unite de quantité de vent:
100 m
Matériau:

St 37, galvanisé
. Revêtement spécial : Plastique polymère renforcé par un tissu

.
Couleur:
noir
Longueur de la tôle d'étanchéité:

2.0 m

La sécurité est un élément essentiel de la protection de l'environnement et de la santé publique.

Hauteur de la tôle d'étanchéité:
160 mm

Épaisseur de la tôle:

Environ 0,6 mm

Épaisseur Revêtement spécial:

Environ 0,15 mm

L'utilisation de l'eau est une question de sécurité.

Épaisseur totale de la tôle d'étanchéité:

Environ 0,9 mm

Certificat de contrôle / autorisations:

Certificat d'essai général de la surveillance des chantiers (AbP)
MFPA Leipzig

zones de changement d'eau adaptées:

Ja

Ja

Conforme à:

Classe d'utilisation A pour les classes de sollicitation 1 et 2, conformément à la directive WU

.
Substances contenues dans la liste SVHC ou poids proportionnel ≥0,1%.:

Non

Le produit est conforme à REACH:

Ja

Ja

Emballage:

Boîte en bois (210 x 30 x 25 cm)
50 pcs bandes
55 pièces d'agrafes de butée
12 caisses par palette

Exposition aux UV:

Les tôles déjà installées lors de la première étape de bétonnage peuvent être exposées aux intempéries UV pendant 4 semaines maximum, jusqu'à leur installation complète dans le béton. En cas d'interruption prolongée de la construction, les tôles doivent être protégées séparément contre les rayons UV (films sombres, etc.) afin de ne pas nuire à leur utilisation.

stockage:
Conserver dans l'emballage d'origine intact et non ouvert, au sec et à l'abri de la lumière directe du soleil.
mis au rebut:
Peut être éliminé dans des décharges d'ordures ménagères en respectant les dispositions locales en matière d'élimination des déchets.

Remove the bottom half of the parted protective foil from the special coating.


Place the VB joint sheet metal in the centre of the rising wall on top of the upper reinforcement layer.
Push the mounting brackets with a maximum distance of 70 cm over the sheet metal and fix them to the upper reinforcement layer with binding wire.
The embedment depth in the concrete must be at least 3 cm and must not be more than half the height of the sheet metal.


The VB joint sheet metal  must overlap by at least 6 cm in the area of the joint, in the straight sections and also in the corner area.


To do so, the upper protective foil must be turned back in the area subsequently to be joined.


Overlap the VB joint sheet metal by at least 6 cm and press the two ends firmly together.
The joint must be glued over its full height and entire surface to prevent subsequent water permeation.
There must be no contamination on the adhesive surfaces that could interfere with bonding.


Secure the joint with one of the fixing clips provided and fold the protective foil back onto the special coating.


Prepared joints in the straight sections as well as the corner area.

Once the foundation slab has been concreted, and before the wall formwork is closed or the double wall elements have been set up, the remaining protective foil must be removed.
The concreting of the wall base and corresponding preparations must be carried out in accordance with the established technical standards.

Status: 23.03.2022


joint sheet metal in precast wall

Télécharger DWG

Télécharger PDF

join sheet metal in in-situ concrete

Télécharger DWG

Télécharger PDF

accessoires

accessoires appropriés

Tôle d'étanchéité Kit de raccordement de bande de joint

Le raccordement de la bande de joint de la tôle d'étanchéité est un moyen simple, rapide et sûr de raccorder la tôle d'é...

Test de résistance à l'eau sous pression
Tôle d'étanchéité VB coin 90

Elément d'angle préfabriqué à 90 °. ...

Agrafe de choc h=170 mm

Pour sécuriser les joints de chevauchement des tôles de jointoiement revêtues. ...

Omegabar 160 mm

Etrier de fixation pour tôles de jointure jusqu'à 160 mm de hauteur. ...

Produits similaires

Vous trouvez ici des produits similaires.

Tôle d'étanchéité MASTER

La tôle d'étanchéité avec rail de maintien pour l'étanchéité des joints de construction. L'étanchéité des joints ...

Test de résistance à l'eau sous pression
Tôle d'étanchéité 160 Rouleau VB2

L'étanchéité des joints de construction en béton doit répondre à des exigences élevées en matière de technique d'étanché...

test de la stabilie CE Test de résistance à l'eau sous pression

Contactez nous

We are happy to answer your questions

S'il vous plâit mentionner le nom
please_enter_company
please_enter_city
S'il vous plâit mentionner la adress e-mail
S'il vous plâit mentionner l'objet
S'il vous plâit mentionner le message

Please fill the following captcha to reduce spam.

Veuillez saisir le captcha.

En manque de votre consentement nous ne pouvons pas accepter votre demande de contact