Lámina de estanqueidad 160 VB 2 bandas á 2,00 m-o.O.
Totalmente recubierto por ambas caras

número de artículo 070432

Hoja de juntas VB en tiras

prueba de durabilidad CE Prueba de presión del agua

Totalmente recubierto por ambas caras
Lámina de sellado de 160 mm de ancho
Longitud del elemento 2,0 m
Embalaje 50 elementos
incl. 55 abrazaderas

Certificado de inspección de obras MFPA Leipzig
Agua subterránea neutra

Añadir a la lista de avisos

La información más importante de un vistazo

switch_to_language DE
switch_to_language GB
switch_to_language FR
switch_to_language NL
switch_to_language IT
switch_to_language ES
switch_to_language CZ
switch_to_language PL
switch_to_language RO
switch_to_language DK
switch_to_language SE
switch_to_language NO
switch_to_language FI
switch_to_language RS
switch_to_language RU
switch_to_language GR
switch_to_language TR

Ir a Youtube

número de artículo:
070432
grupo de artículos:
200 - Dichtblech VB Streifen h=160 mm
GTIN:
4251689511011
número de arancel aduanero:
73269098
unidad de embalaje:
caja
unidad de cantidad de venta:
100 m
material:

St 37, galvanizado
Revestimiento especial: plástico polímero reforzado con tejido

color:
negro
Longitud de la placa de sellado:

2,0 m

Altura de la placa de cierre:

160 mm

Grosor de la chapa:

Aproximadamente 0,6 mm

Espesor de revestimiento especial:

Aproximadamente 0,15 mm

Espesor total de la lámina de sellado:

Aproximadamente 0,9 mm

Certificado de pruebas / autorizaciones:

Certificado de prueba de la autoridad general de la construcción (AbP)
MFPA Leipzig

Zonas de cambio de agua adecuadas:

Ja

Corresponde a:

Utilizar clase A para clase de carga 1 y 2 de acuerdo con la directriz WU

Contiene sustancias de la lista SVHC o peso proporcional ≥0,1%.:

No

El producto cumple la normativa REACH:

Ja

Embalaje:

Caja de madera (210 x 30 x 25 cm)
50 unidades de listones
55 unidades de abrazaderas
12 cajas por palet

Intemperie UV:

Las planchas que ya han sido instaladas en la primera sección de hormigonado pueden exponerse a la intemperie libre de rayos UV durante un máximo de 4 semanas hasta que estén completamente instaladas en el hormigón. Si los trabajos de construcción se interrumpen durante un periodo más largo, las planchas deberán protegerse especialmente contra los rayos UV (láminas oscuras, etc...) para no perjudicar su capacidad de uso.

almacenamiento:
Conservar en su envase original intacto y sin abrir, en un lugar seco y protegido de la luz solar directa.
eliminación:
Puede eliminarse en vertederos domésticos de conformidad con la normativa local sobre eliminación de residuos

Remove the bottom half of the parted protective foil from the special coating.


Place the VB joint sheet metal in the centre of the rising wall on top of the upper reinforcement layer.
Push the mounting brackets with a maximum distance of 70 cm over the sheet metal and fix them to the upper reinforcement layer with binding wire.
The embedment depth in the concrete must be at least 3 cm and must not be more than half the height of the sheet metal.


The VB joint sheet metal  must overlap by at least 6 cm in the area of the joint, in the straight sections and also in the corner area.


To do so, the upper protective foil must be turned back in the area subsequently to be joined.


Overlap the VB joint sheet metal by at least 6 cm and press the two ends firmly together.
The joint must be glued over its full height and entire surface to prevent subsequent water permeation.
There must be no contamination on the adhesive surfaces that could interfere with bonding.


Secure the joint with one of the fixing clips provided and fold the protective foil back onto the special coating.


Prepared joints in the straight sections as well as the corner area.

Once the foundation slab has been concreted, and before the wall formwork is closed or the double wall elements have been set up, the remaining protective foil must be removed.
The concreting of the wall base and corresponding preparations must be carried out in accordance with the established technical standards.

Status: 23.03.2022


joint sheet metal in precast wall

Descargar DWG

Descargar PDF

join sheet metal in in-situ concrete

Descargar DWG

Descargar PDF

Accesorios

accesorios adecuados

Hoja de sellado cinta de juntas juego de conexión

La conexión de la cinta de unión de la lámina de sellado es una forma sencilla, rápida y segura de conectar la lámina de sellado V...

Prueba de presión del agua
Placa de sellado VB esquina 90 °

Elemento prefabricado de esquina de 90° ...

Abrazadera a tope h=170 mm

Para asegurar las juntas de solapamiento de waterstops metálicos revestidos ...

Omegabar 160 mm

Estribo de fijación para waterstops metálicos hasta una altura de 160 mm ...

Productos similares

Puede encontrar productos similares aquí.

Placa de sellado MASTER

La lámina de sellado con riel de retención para sellar juntas de construcción En el sellado de juntas de construcción de hormigó...

Prueba de presión del agua
Hoja de sellado 160 VB2 rollo

El sellado de juntas de construcción de hormigón plantea grandes exigencias a la tecnología de sellado. Las láminas de sellado com...

prueba de durabilidad CE Prueba de presión del agua

Contacto

Estaremos encantados de responder a sus preguntas

Por favor, introduzca su nombre
introduzca la empresa
introduzca la ciudad
Introduzca su dirección de correo electrónico
Introduzca el asunto
Por favor, introduzca el mensaje

Por favor, rellene el siguiente captcha para reducir el spam.

Por favor, introduzca el captcha.

No podemos ponernos en contacto con usted si no está de acuerdo con nuestra declaración de confidencialidad de datos.