entièrement revêtu des deux côtés avec pied
numéro d'article 070468
Aperçu des informations les plus importantes
St 37, galvanisé
.
Revêtement spécial : Plastique polymère renforcé par un tissu
20,00 m
160 mm
approx. 0,6mm
approx. 0,15 mm
approx. 0,9 mm
Test report PB 5.1/14-423-3
MFPA Leipzig
yes
Utility class A for the wear classes 1 and 2 in accordance with the WU guideline
No
Yes
carton (40 x 40 x 20 cm)
1 roll
2 fixing clips
36 cartons per pallet
Packaging
1 Role with 20 m
2 fixing clips
Remove the bottom half of the parted protective foil from the special coating.
Place the Joint Sheet Metal Role-F on the top reinforcement in the center of the rising wall. Use binding wire to tie the fastening foot to the reinforced layer. The emedment depth in the concrete must be at least 3 cm and must not exceed half of the sheet height (8 cm).
By bending and crimping a festenig foot to the opposite side (approx. every 50 cm) the position of the sheet can be addtionally stabilized.
In the corner area, the sheet is bent according to the course of the corner. It is advisable here to bend over a "sharp" edge.
At transition joints, the Joint Sheet Metal Role-F must be overlapped by at least 6cm. For this purpose, the protective film is folded badk along the length of the overlap.
The overlapping surfaces are pressed together over the entire surface and secured with one of the supplied fixing clips. Ther must be no dirt on the adhesie surfaces that could impair the bonding.
The Joint Sheet Metal Role-F must form a self-contained, defect-free circuit. The upper half of the protective film must remain on the special coating until the latest possible time. The concreting of the wall base and the corresponding preparations for this must be carried out in accordance with the recognized technical regulations.
Status: 23.03.2022
Contactez nous
We are happy to answer your questions