Plne potiahnuté na oboch stranách
číslo článku 070464
VB spojenie plechu vo zvitkoch
Tesnenie škár betónových konštrukcií kladie vysoké nároky na technológiu tesnenia.
Tesniace fólie s jednostrannou alebo obojstrannou povrchovou úpravou, tesniace fólie v roli 120 VB1 alebo VB2, zabezpečujú bezpečné a trvalé utesnenie betónových stavebných škár proti tlakovej a netlakovej vode. Pridať do zoznamu upozornení
Najdôležitejšie informácie na prvý pohľad
St 37, pozinkovaná
Špeciálna povrchová úprava: polymérový plast vystužený tkaninou
20 m
120 mm
cca 0,15 mmm
O 0,9 mm
Osvedčenie o skúške všeobecného stavebného úradu (AbP)
MFPA Lipsko
ja
Triedu A použite pre triedy zaťaženia 1 a 2 v súlade s usmernením WU
Nie
Ja
Kartón ( 40 x 40 x 20 cm)
1 ks role
2 ks tupých svoriek
30 ks upevňovacích konzol
48 krabíc na palete
Remove the bottom half of the parted protective foil from the special coating.
Place the VB joint sheet metal in the centre of the rising wall on top of the upper reinforcement layer.
Push the mounting brackets with a maximum distance of 70 cm over the sheet metal and fix them to the upper reinforcement layer with binding wire.
The embedment depth in the concrete must be at least 3 cm and must not be more than half the height of the sheet metal.
PLEASE NOTE!! The coating of the joint sheet metal VB1 must face the waterlogged side!
The VB joint sheet metal must overlap by at least 6 cm in the area of the joint, in the straight sections and also in the corner area.
To do so, the upper protective foil must be turned back in the area subsequently to be joined.
Overlap the VB joint sheet metal by at least 6 cm and press the two ends firmly together.
The joint must be glued over its full height and entire surface to prevent subsequent water permeation.
There must be no contamination on the adhesive surfaces that could interfere with bonding.
Secure the joint with one of the fixing clips provided and fold the protective foil back onto the special coating.
Prepared joints in the straight sections as well as the corner area.
Once the foundation slab has been concreted, and before the wall formwork is closed or the double wall elements have been set up, the remaining protective foil must be removed.
The concreting of the wall base and corresponding preparations must be carried out in accordance with the established technical standards.
Status: 23.03.2022